Self-storage
Unit mix, buildings, drive aisles, gates, access, circulation, and rentable area.
02 / Site planning
IPG helps owners test RV storage layouts, covered parking rows, and self-storage site plans, then coordinate the next design steps.
Property boundaries, access, setbacks, existing improvements, utilities, and known site constraints shape the area available for development. IPG organizes those inputs with the owner’s storage or parking goals, then reviews how circulation, coverage, and future expansion fit together.
What IPG plans
RV storage site planning starts with long vehicles and trailers. Covered parking layouts add pedestrian routes and existing parking-row constraints. Conventional self-storage requires unit mix, building access, and customer circulation. IPG helps coordinate these needs with civil, structural, and other qualified professionals.
Unit mix, buildings, drive aisles, gates, access, circulation, and rentable area.
Covered and uncovered stalls, large-vehicle movement, stall depth, aisle width, and canopy placement.
Covered parking, resident access, phasing, drainage, parking count, and installation sequence.
Shopping centers, parking lots, business parks, customer access, tenant operations, and column layout.
Solar-ready layout, structure, utilities, clearances, parking or storage use, and engineering coordination.
Early planning
Planning work organizes layout assumptions and the design questions that need resolution before pricing and approvals.
Parcel, access, constraints, intended use, and current concept.
Stall count, circulation, corners, gates, entrances, exits, and coverage.
Civil, structural, drainage, utilities, and canopy or solar needs where relevant.
Clarify the plan so vendors and contractors price the same scope.
A parcel outline or sketch can start the conversation, but a layout is only as reliable as its inputs.
Share any surveys, access information, utility locations, existing buildings, drainage concerns, and feedback from the approving authority. IPG separates working assumptions from confirmed constraints.
Self-storage design balances rentable area with how customers move through the site. Building placement, drive-aisle widths for moving trucks, the gate and office location, and climate-controlled versus drive-up space all come from the same plan.
IPG tests that plan against the market review and the budget, so the unit mix you lease is one the site can hold.
See self-storage development consulting
Agree on the decisions the layout needs to support: comparing site options, setting a covered and uncovered mix, reserving expansion space, or clarifying a scope for pricing. IPG organizes layout comments, circulation and coverage assumptions, and design questions for the project team.
Planning review does not grant permit approval or replace engineered documents. Qualified professionals remain responsible for engineering, and the authorities make permitting decisions.
Questions owners ask about RV storage and self-storage site planning.
Yes. Parcel information, a sketch, and owner goals can support a first review. IPG identifies what is still needed; early layouts remain subject to survey, design, and authority requirements.
Long vehicles and trailers affect turning paths, backing areas, gate approaches, stall depth, and clearances. Columns and covered rows have to be planned with those movements, not added afterward.
Yes. IPG supports self-storage unit mix, building placement, gates, customer circulation, and expansion planning, including sites that combine units with RV or boat storage.
IPG coordinates the planning and design process. Qualified professionals provide engineering and technical documents, and the authorities review and approve permits.